Project Name:

Greater Beirut Water Supply

Client:
Lebanese government – CDR

Date:
2016 – on going

Location:
Lebanon

Project brief


This project is for the construction of a series of tunnels and pipelines to convey water from the existing hydroelectric power system tunnel near the village of Joun some 30 km south of Beirut to the site of proposed reservoirs at Hadath90 and Hadath125 in south of Beirut.
The proposed works comprise the following key elements: site investigations, tunnel to convey raw water, Determination of final route and Insitu tunnel lining design, steel tunnel design, and steel pipe design in open cut trench as well as shaft lining design.

Please follow and like us:
Pin Share